Bashor Field Restoration

When Mother Nature flooded a local corn field, 4X moved 47,000 cubic yards of dirt to fill in flood damage and raise a low spot in field. Our Topcon surveying software helped us quickly and accurately calculate the amount of dirt needed to fill in the field. Topcon connects directly with sensors in our blades to determine when the fill dirt has reached the correct level. We added four feet of fill to replace the soil lost to the flood and avoid damage from future flooding.

No Comments

Sorry, the comment form is closed at this time.